Procedure

feeds id
المجلد 07: ضوابط المشروع وإعداد التقارير-الفصل 2:إدارة ضبط التكلفة-إجراء

Project Cost Coding Structures Procedure

This procedure provides guidelines and instructions to project controls personnel regarding the breakdown of project cost into manageable contracts, work packages, activities and control accounts. It also describes the development and integration of the project coding structure to provide a sound basis for collecting, monitoring and reporting cost and schedule status and performance information on a project